Business12 min read
How to respond to a government RFP with AI: compliance matrix first, then the proposal
The Draimo team

Short answer
Answer a government RFP in this order: read Section C for the work, Section L for how to build the proposal and Section M for how it is scored; list every requirement in a compliance matrix; then write each part to the evaluation factors. AI is fastest at the reading and the matrix. Attach the RFP to Draimo, ask for every "shall" and "must" with its section number, then draft against it.
Try it in Draimo
Start with the matrix
- Read this RFP and build a compliance matrix: every shall, must and will statement, its section number, and where our response must answer it
- Compare Section L and Section M of this solicitation and list anything Section M scores that Section L never tells us to submit
- Files
- Attach a PDF, Word file, slides or a photo and ask about it.
- One file per message on every plan; several at once on paid plans
- Documents
- Writes reports, proposals and decks from your brief and files, and downloads them as Word, PDF, PowerPoint or Excel.
- Draimo Pro
- Projects
- Keeps everything for one goal together: documents, sites and research.
- Every plan
How a federal solicitation is organised
Most US federal RFPs follow the uniform contract format set in FAR 15.204-1: thirteen sections, A through M. Three of them decide your response. Section C describes the work. Section L, Instructions, conditions and notices to offerors, tells you exactly how to build the proposal. Section M, Evaluation factors for award, tells you how it will be scored.
State and city solicitations, and tenders outside the US, use different labels for the same three ideas: the scope of work, the submission instructions and the evaluation criteria. Find those three first, whatever they are called.
| Section | Title | What you take from it |
|---|---|---|
| B | Supplies or services and prices/costs | The line items your price volume must match |
| C | Description, specifications, statement of work | What you must do, and every requirement your technical volume must answer |
| K | Representations, certifications and statements | What you must certify, often from your SAM.gov record |
| L | Instructions, conditions and notices to offerors | Volumes, page limits, fonts, file names, and what to include |
| M | Evaluation factors for award | How each part is scored, and how factors are weighted against price |
Before you write: registration and the bid decision
To compete for federal awards as a prime, your entity needs an active SAM.gov registration, which must be renewed every 365 days. Check it early; a lapsed registration is a reason not to bid, not a detail to fix on the due date.
Then make an honest bid decision. Can you do the work at the scale described? Do you have past performance that matches it? Can you meet the page limits with real substance? Ask Draimo to summarise the scope, the period of performance, the mandatory qualifications and the evaluation weighting on one page, so the decision rests on the solicitation rather than its title.
Build the compliance matrix
The compliance matrix is the most valuable hour in any proposal. It lists every requirement in the solicitation, its section number, and where your proposal answers it. Evaluators score against the solicitation's own words, and a requirement you missed scores nothing however well the rest is written.
This is where AI saves the most time. Attach the RFP and ask for every shall, must and will statement, numbered to match the RFP's own structure. Then ask the second question every experienced writer asks: what does Section M score that Section L never tells us to submit? Those gaps are where proposals quietly lose points. Read the matrix against the RFP yourself; the matrix is only as good as its last check.
| Column | Example |
|---|---|
| Requirement | The contractor shall provide daytime porter service, 7:00 a.m. to 3:30 p.m. |
| RFP reference | C.4.2 |
| Evaluation factor | M.2 Technical approach |
| Where we answer it | Volume I, section 3.2 |
| Owner and status | Operations lead, drafted |
Write to the evaluation, not to the scope
A response that restates the scope of work tells the evaluator nothing. Each section should do three things: show that you understand the requirement, say specifically how you will meet it, and give the evidence that you can, such as a staffing plan, a method, a past contract of similar size.
Use the solicitation's own words and numbering in your headings, so the evaluator finds each answer where they expect it. Ask Draimo to draft each technical section from your method notes and the matching matrix rows, then ask it to point out every sentence that makes a claim without evidence.
Past performance and the price volume
Past performance is scored on relevance: similar scope, size and complexity, and recent. Keep a short record of each past contract, with the customer, the value, the period, the scope and a reference, in your project. Draimo can then match the right two or three to each solicitation and write each summary to the relevance criteria.
Your price volume must match the line items in Section B exactly. When you build the pricing tables in a Draimo document, percentage lines such as overhead and fee, and the totals, are recomputed, so the arithmetic in the submitted file reconciles. The rates themselves are your business decision.
The rules that disqualify
Section L is pass or fail before any content is read. Check every one of these against the solicitation, including any amendments issued after release:
- Page limits for each volume, and what counts towards them.
- Font, size, margins and line spacing. Ask Draimo for the exact settings when you request the document.
- Volume structure, file format and file names.
- Required forms, certifications and signatures.
- Acknowledgement of every amendment.
- The due date, time and time zone, and the submission method.
How to do it with Draimo
See the finished shape first: this eleven-page federal RFP response for janitorial services in a Denver office building was made on Draimo, and its gallery page shows the prompt that produced it.
- Create a project for the bid and attach the RFP and any amendments.
- Ask for a one-page summary and the compliance matrix, then check it against the RFP.
- Make the bid decision.
- Draft each volume against the matrix, with the exact formatting from Section L.
- Edit in plain words, and ask for a final pass that checks every matrix row has an answer.
- Download the files, review them as an evaluator would, and submit on time.
State, local and international tenders
The same method works for a city cleaning contract, a state IT procurement or a public tender abroad. Draimo's gallery includes a City of Tshwane tender for solar backup at 12 clinics, a Kenyan county bid and a Swedish municipal tender written in Swedish. The labels change; the reading, the matrix and writing to the scoring do not.
Questions people ask
- Can AI write an RFP response?
- AI can read the solicitation, build the compliance matrix and draft each section from your notes, which is most of the hours. You still decide whether to bid, set the price, and check every requirement is answered before you submit.
- What is a compliance matrix?
- A table of every requirement in the solicitation, with its section number, the evaluation factor it relates to, and where your proposal answers it. It is how you make sure nothing an evaluator scores is missed.
- What are Section L and Section M?
- In the federal uniform contract format, Section L gives the instructions for preparing the proposal, and Section M gives the evaluation factors for award. Read them together.
- Do I need to be registered in SAM.gov to bid?
- To apply for federal awards as a prime awardee you need an active SAM.gov registration, renewed every 365 days.
- Can Draimo read a long RFP PDF?
- Yes. Attach the PDF and ask about it. Every plan can attach one file to a message; paid plans can attach several at once, such as the RFP and its amendments.
- Does it work for state and local bids?
- Yes. Find the scope, the instructions and the evaluation criteria, whatever they are called, and use the same matrix method.
Sources we checked
Checked October 21, 2026. Dates and amounts change every year. Ask Draimo for this year's figures, grounded in official sources.
Attach the solicitation and get the compliance matrix first.
Build the matrix

